Trainee Roel van Doorn Graduates at Gouda-Geo

June 27th, 2012

The past 9 months Roel van Doorn has done his graduate internship at Gouda-Geo. He has worked on multiple projects. Roel has designed a brand-new transport trolley for CPT equipment and a simple yet effective catching clamp.

His final thesis involved the design of a highly sophisticated hydraulic push-and-pull clamp. Not only we were impressed with his commitment and results; his school was that as well. It is for this reason that Roel has successfully completed his studies yesterday.

Next year Roel will do a Higher Technical Study (HTS) program at the Hogeschool van Amsterdam. Roel will remain working for Gouda-Geo during his studies and will be engaged in the design of new geotechnical products. More to come . . .

Piezocone Dissipation test Water level meter CPT crawler CPT Electric cones Seismic CPT Magnetometer Gouda Jacket cone Soil sampler Dynamic penetrometer Cone Penetration Testing Piezometer CPTU Inclinometer
CPT truck Crawler-Truck Begemann cone Vane tester